Swimming Pools & Jacuzzi
Pool construction and finishing with filtration and heating, from excavation to first fill.

A pool is the garden element where fixing it later costs more than building it right. We deliver from excavation, concrete and waterproofing through to finishes, filtration and lighting. The filtration and heating package is sized to the pool volume and how often it is used, not to the cheapest option, and we hand over an operating guide covering the maintenance schedule and chemical levels. **A pool needs a permit in most cases** — check the permit guide before you start.
A pool is a structural project, not a decorative feature
The pool shell is a buried concrete tank under pressure from both sides: soil pressure outside and water pressure inside — and where groundwater is high, uplift pressure from below as well. So the structural design and reinforcement are not remote technical details; they decide whether the shell cracks in two years.
And that stage cannot be corrected. Any concrete or waterproofing problem means demolishing the finish to reach it.
Waterproofing is where the wrong saving happens
Waterproofing goes in before the finish and is completely hidden beneath it. That makes it the first place cost is cut, and the result appears a year or two later: continuous water-level loss, damp in the surround, or marks on an adjacent wall. Repair then costs many times the saving.
Filtration is sized to water volume
A common error is choosing pump and filter by surface area. What determines the system is water volume and the required turnover rate — a narrow deep pool can hold more than a wide shallow one. An undersized system means inadequately filtered water and higher chemical consumption to compensate.
Cooling, not heating
This is the core difference between UAE pools and those in temperate climates. Through summer, pool water reaches temperatures that remove any sense of refreshment. A chiller solves that; a heater helps in winter if you swim year-round — they are not alternatives to each other.
The surround is part of the project
Pool decking is wet daily, so slip resistance is a safety requirement, not a preference. Heat absorption matters equally — tile too hot for bare feet cancels midday use. And drainage must carry water away from the pool, not into it.
The plant room
It is positioned at design stage, not afterwards. Its location must allow technician access, adequate ventilation and drainage. A cramped or awkward plant room means deferred maintenance, and deferred maintenance becomes failure.
Scope of work
- Excavation, reinforced concrete and waterproofing
- Mosaic, tile or liner finish
- Correctly sized filtration and pumps
- Heating or chilling on request
- Underwater lighting and steps
- Operating guide and maintenance schedule
How we deliver
Study and design
Position, depth and shape; soil and groundwater investigation; and water-volume calculation, which determines the whole filtration system.
Excavation and concrete
Precise excavation levels, reinforcement, and concrete to a resistant specification. This stage cannot be corrected later.
Waterproofing and pipework
Multi-layer waterproofing, suction, return and drain lines, and a plant room positioned for real maintenance access.
Finishing and commissioning
Tile, stone or finish coat, filling and water balancing, then a test run and handover with a maintenance walkthrough.
Frequently asked
Does a pool need a permit?
Heater or chiller?
How much does a pool consume?
Salt or chlorine?
How long does it take?
Can the jacuzzi be separate?