Pool construction and finishing with filtration and heating, from excavation to first fill.

Swimming Pools & Jacuzzi

A pool is the garden element where fixing it later costs more than building it right. We deliver from excavation, concrete and waterproofing through to finishes, filtration and lighting. The filtration and heating package is sized to the pool volume and how often it is used, not to the cheapest option, and we hand over an operating guide covering the maintenance schedule and chemical levels. **A pool needs a permit in most cases** — check the permit guide before you start.

A pool is a structural project, not a decorative feature

The pool shell is a buried concrete tank under pressure from both sides: soil pressure outside and water pressure inside — and where groundwater is high, uplift pressure from below as well. So the structural design and reinforcement are not remote technical details; they decide whether the shell cracks in two years.

And that stage cannot be corrected. Any concrete or waterproofing problem means demolishing the finish to reach it.

Waterproofing is where the wrong saving happens

Waterproofing goes in before the finish and is completely hidden beneath it. That makes it the first place cost is cut, and the result appears a year or two later: continuous water-level loss, damp in the surround, or marks on an adjacent wall. Repair then costs many times the saving.

Filtration is sized to water volume

A common error is choosing pump and filter by surface area. What determines the system is water volume and the required turnover rate — a narrow deep pool can hold more than a wide shallow one. An undersized system means inadequately filtered water and higher chemical consumption to compensate.

Cooling, not heating

This is the core difference between UAE pools and those in temperate climates. Through summer, pool water reaches temperatures that remove any sense of refreshment. A chiller solves that; a heater helps in winter if you swim year-round — they are not alternatives to each other.

The surround is part of the project

Pool decking is wet daily, so slip resistance is a safety requirement, not a preference. Heat absorption matters equally — tile too hot for bare feet cancels midday use. And drainage must carry water away from the pool, not into it.

The plant room

It is positioned at design stage, not afterwards. Its location must allow technician access, adequate ventilation and drainage. A cramped or awkward plant room means deferred maintenance, and deferred maintenance becomes failure.

Scope of work

  • Excavation, reinforced concrete and waterproofing
  • Mosaic, tile or liner finish
  • Correctly sized filtration and pumps
  • Heating or chilling on request
  • Underwater lighting and steps
  • Operating guide and maintenance schedule

How we deliver

  1. Study and design

    Position, depth and shape; soil and groundwater investigation; and water-volume calculation, which determines the whole filtration system.

  2. Excavation and concrete

    Precise excavation levels, reinforcement, and concrete to a resistant specification. This stage cannot be corrected later.

  3. Waterproofing and pipework

    Multi-layer waterproofing, suction, return and drain lines, and a plant room positioned for real maintenance access.

  4. Finishing and commissioning

    Tile, stone or finish coat, filling and water balancing, then a test run and handover with a maintenance walkthrough.

Frequently asked

Does a pool need a permit?
In most emirates and communities, yes, and the authority varies by location. **We do not obtain permits** — we prepare drawings and specifications; submission is by the owner or an approved consultant. The site has a permits guide showing the authority per emirate.
Heater or chiller?
In the UAE cooling matters more than heating for most of the year — pool water reaches uncomfortable temperatures in summer. A heater helps in winter if you swim year-round.
How much does a pool consume?
It depends on volume, evaporation rate, filtration type and pump running hours. A cover reduces evaporation substantially, and evaporation is the largest loss in a hot climate.
Salt or chlorine?
A salt system generates chlorine itself, feels gentler on skin and needs less daily attention. Upfront cost is higher, and cells need periodic replacement.
How long does it take?
4–10 weeks depending on size, finish and ground conditions. High groundwater specifically extends the excavation and waterproofing stages.
Can the jacuzzi be separate?
Yes — it can share the pool's plant or run on its own equipment. Shared is cheaper; separate lets you run it without running the whole pool.