Service areas

Landscaping & renovation in Abu Dhabi

Many Abu Dhabi projects fall under the Estidama programme and its Pearl rating, which imposes water consumption and plant selection requirements from the design stage, not after.

Authority for permits

بلدية مدينة أبوظبي · دائرة البلديات والنقل

Permit guide

Approvals required

  1. 1Developer or community management approval
  2. 2Submission through the department's building permit system
Expected timeline:5–15working days

Constraints to know about

  • • Many Abu Dhabi projects fall under the **Estidama** programme and its Pearl rating, which imposes requirements on water consumption and plant selection.
Building without a permit exposes you to fines and demolition, and can block utility connections to the property.

Last verified: 2026-09-01 · Sources are published guides, not documents from the authority itself.

Communities we serve

Estidama is not optional on many projects

The Estidama programme rates projects against its Pearl standard, and many Abu Dhabi projects — especially larger communities and commercial developments — must meet it. For landscaping, that means native or climate-adapted plants instead of thirsty imported species, high-efficiency irrigation, and reducing heat-reflecting paved area. These decisions are made at design stage, because changing them after construction costs several times more.

Authority and permit timeline

The Department of Municipalities and Transport is the responsible authority, starting with developer or community management approval before submission through the department's building permit system. The typical timeline is 5 to 15 working days, though projects requiring an Estidama assessment take longer since the assessment is an added step before final approval.

Areas we serve

Khalifa City, Al Reef, Al Raha Gardens, Saadiyat Island, Yas Island, Mohammed Bin Zayed City, and freehold properties across the city and surrounding areas.

What sets execution apart in Abu Dhabi

Irrigation water salinity in Abu Dhabi runs higher than in some other parts of the UAE, which decides the available plant list from the outset. High summer heat combined with coastal humidity near the sea makes choosing hardscape materials that don't reflect heat a decision, not a preference — light-coloured paving instead of dark in exposed areas, for instance.

projects delivered here

Our services

Our services in Abu Dhabi

Frequently asked

Is Estidama assessment required for every Abu Dhabi project?
No, it depends on the community and project type. We tell you from the first site visit whether your project needs an Estidama assessment or not.
Does high salinity mean fewer plant options?
It means a different list, not necessarily a shorter one — there are plenty of native and adapted species that tolerate high salinity and actually thrive.
Do you work on Saadiyat and Yas Islands?
Yes, though these areas often carry additional design requirements from the master developer, which we account for at design stage.
Does the permit take longer if the project needs Estidama?
Yes, an Estidama assessment is an added step before final approval, so the total timeline extends beyond the typical 5 to 15 working days.
Do high-efficiency irrigation systems raise the upfront cost?
Usually a little, but the difference pays back in long-term water consumption — we show you the comparison at design stage so you can decide.
Do you handle independent freehold properties in Abu Dhabi?
Yes, and the approval path is often simpler since it's direct with the department, without an added developer approval layer.

Ready to start your project?

A free site visit anywhere in the UAE within 48 hours — no obligation.

Call nowWhatsApp us